• (Published in the Stillwater N...

(Published in the Stillwater News Press March 16, 23, 2017. 2t) Northern Oklahoma College, hereinafter referred to as Owner and Flintco, LLC, hereinafter called the Construction Manager, will receive SEALED bids to provide the work included in the NOC New Building - Bid Package 1&2 - Electrical Re-bid located in Stillwater, OK, on April 6, 2017 at 2:00 PM CST. All properly sealed and labeled bids will be received at the Long Range Facilities Planning Office, Oklahoma State University, Scott Hall - Room 506; Stillwater, OK 74078 at which time proposals will be opened and read aloud. **Project documents forthcoming, this is a re-bid of the electrical scope for the purposes of a re-design of the underground electrical systems. The following bid packages are part of this phase of bidding: • **Electrical Under slab All bids are to be sealed and CLEARLY labeled by describing the project and indicating the package being bid, on the envelope as described in the Instructions to Bidders. A Bid Security, as stipulated in the bid documents, in the amount of 5% of the bid shall accompany the sealed proposal of each bidder if the amount of the bid exceeds $50,000. Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and Holidays, before time set for opening bids, as well as bids received after time set for opening bids, will not be considered and will be returned unopened. The Contract and Bidding Documents will be available for examination at the project office of the Construction Manager located in Stillwater, OK between the hours of 8:00 a.m. to 5:00 p.m., Monday through Friday. Please contact Jeff Blose at (918) 710-2218 or Shane Edmondson at (918) 710-2212 with any questions about bid procedures or documents. Copies of the contract and bidding documents, including the drawings and specifications, may also be reviewed at the Dodge Plan Room, Southwest Construction News and Bid News Construction Reports. All Bidders for this project are required to meet all qualification requirements as established in these bid documents. Upon receipt of an acceptable bid, the contract will be awarded within thirty (30) days after opening bids and the written contract executed within sixty (60) days thereafter. The Owner reserves the right to reject any or all bids or to waive any informalities or irregularities in the bidding.
This ad has been viewed 99 times
PostedMarch 16, 2017